320,000 tons of contaminated soil from the site have been cleaned.
21,000 gallons of free-floating petroleum were removed from the groundwater at the site.
2,265,000 gallons of contaminated groundwater have been treated.
23 oil storage tanks were removed from the Upper Yard.
180 tons of asphalt were removed from the site
Over 250 condominium homes built on the former site of the Upper Yard.
|